Jenis bayaran:L/C,T/T
Pesanan minimum:1 Set/Sets
Port:Ningbo Port
$5555≥1Set/Sets
Brand Name: Zhongsu
Condition: New
Spare Parts Type: Barrel
Video Outgoing-inspection: Provided
Machinery Test Report: Provided
Jenis Pemasaran: Produk biasa
Warranty: 1 Year, Common Is 2-3 Years,Bimetallic Is Longer
After-sales Service Provided: Free Spare Parts, Video Technical Support, Online Support
Key Selling Points: Competitive Price
Local Service Location: Thailand
After Warranty Service: Video Technical Support, No Service, Spare Parts
Applicable Industries: Manufacturing Plant, Machinery Repair Shops
Showroom Location: None
Product Name: Parallel T Twin Screw And Barrel For Extrusion Line
Plastic Machine: Extruder Machine
Diameter Of Screw: 25-105mm
Surface Treatment: Nitrided Treatment Or Alloy Spraying
Certificate: Iso9001:2008
Thickness Of Nitriding Layer: 0.5-0.8mm
Application: Pvc Plastic
Advantage: Improve The Working Life
Place Of Origin: Zhejiang, China
Material: 38crmoala, 38crmoala Tungsten Alloy Skd61gh113
Pembungkusan: Filem yang dibungkus dalam kes kayu tanpa pengasapan (standard eksport)
Sokongan mengenai: 500 Set/Sets per Month
Port: Ningbo Port
Jenis bayaran: L/C,T/T
D60 D75 D80 D90 D110 Bimetallic Pvc Pipe Pipe Twin Screw Barrel Barrel Screw Barrel
Kami membekalkan pelbagai skru dan laras tunggal, untuk prestasi yang lebih baik kami juga merancang untuk anda berdasarkan keperluan anda. Lihat beberapa butiran.
Parameter Spesifikasi:
Model | Motor power(kw) | screw diameter(mm) | L/D | screw rotation speed(rpm) | PVC output(kg/h) |
ZS75 | 45 | 75 | 26-36 | 45 | 220-350 |
ZS90 | 55 | 90 | 26-36 | 45 | 280-460 |
ZS110 | 75 | 110 | 26-36 | 45 | 350-650 |
ZS120 | 110 | 120 | 26-36 | 45 | 500-800 |
ZS130 | 132 | 130 | 26-36 | 45 | 680-1000 |
Parameter ini didasarkan pada mesin domestik kami dan hanya untuk rujukan anda. Jika anda mempunyai parameter anda sendiri, kami juga boleh membuatnya.
Bahan mentah dan pemprosesan produk:
Raw material | The finished product processing requirements |
38CrmoAla, SACM645 | Nitriding treatment |
Cr12MoV, Cr12 | Alloy steel |
38CrmoAlA,SACM645,40Cr,AISI4140,42CrMo | Bimetallic of the inner hole centrifugal casting |
GH113,GH132/GH2132/A-286,GH145/InconelX-750 | High temperature alloy;300-1400degree |
Sekiranya anda mempunyai permintaan terhadap bahan tersebut, beritahu saya bila -bila masa, kami akan menawarkan apa -apa keperluan.
Mari lihat skru kembar dan tong:
Permohonan Bahan:
Skop permohonan: WPC PVC, WPC PE, lembaran molekul super tinggi, 1/2 kancing kalsium tinggi, 50-400 paip cacium tinggi, 50-300 profil cacium tinggi, lembaran PVC lembut, XPS-PVC, PP, PE, ABS, PVC, bahan mentah, pelletizing, paip, profil, lembaran dll.
Pembungkusan & Penghantaran
Pembungkusan : Dibungkus oleh filem dalam kes -kes kayu
Pelabuhan Pelabuhan : Pelabuhan Ningbo
Waktu Penghantaran : 25 hari bekerja setelah menerima deposit sebanyak 30% (hari berdasarkan kuantiti anda)
Zhongsu :
Butiran Penghantaran: 25 hari bekerja selepas menerima deposit 30% dan lukisan yang disahkan (beberapa jenis telah siap dalam stok
1. Selesai dalam stok
Lama selepas perkhidmatan
A: Kami adalah kilang, anda boleh mendapatkan harga yang kompetitif dan perkhidmatan yang unggul daripada kami.
S: Berapa lama masa penghantaran anda?
A: Secara amnya ia adalah 5 hari jika barang itu ada dalam stok. atau ia adalah 20-25 hari jika barang tidak ada dalam stok, ia adalah mengikut kuantiti.
S: Bagaimana pula dengan kualiti yang dipastikan
J: Semua proses pengeluaran kami mengikut ketat ISO9001, produk kami tahan lama dengan 12 bulan.
S: Apakah syarat pembayaran anda?
J: Pembayaran<=1000USD, 100% lebih awal. Pembayaran> = 1000USD, 30% T/T terlebih dahulu, baki sebelum penghantaran.